500 KLD Sewage Treatment Plant
MBBR-based STP for a residential township with treated water reuse for landscaping.
MBBR-based STP for a residential township with treated water reuse for landscaping. This project was executed by PASUTECH on a complete turnkey basis — covering design, fabrication, installation, commissioning and operator training.
Our engineering team worked closely with the client to meet the required capacity of 500 KLD while ensuring compliance with all applicable statutory norms.